Well last night I setup some wireing for the computer room and hooked up the vent/light to the tube that will eventually go outside. Have everything in place to vent outside. Just do not want to be cutting the wall right now. Will wait to do the rest until it gets a bit warmer outside. Need to run a few more outlets in the bathroom and hook up the wireing for the computer room to live wire. Move the overhead light to the wall where the sink will be in the bathroom and then I think I will be ready to insulate the rest of the walls. I do need to run the coduit but that should be easy to add after insullation is in. I am ready for the can lights and rest of wall insulation now. Might get both of those this week or weekend.
Recent Posts
Recent Comments
- dbennett_bensoft on Finally, I got very lucky on an APC AP9211
- Newy's Blog on A few new pc items
- bryan on Flooring has been installed
- bryan on Slow season for tv shows
- bryan on Thinking about getting an eye-fi card
0 Responses
Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.
You must be logged in to post a comment.