Carpet installation has been scheduled

Carpet is on the schedule to be made at the carpet mill by march 1st. Delievery should be march 6th. I have scheduled the installer for march 13th. That gives me plenty of time to grout the bathroom, seal the grout and get the mirror and toilet in.

I can think of a few things I need to get done before the carpet is installed. I want to have each room ready one by one. Hallway and stairs are ready. The night before i have to put the carpet and padding out of those areas. I do not want to do that before hand because taylor can get hurt on the tack strips.

I plan to touch up the last of the paint in the office this weekend and get the projector out of there. That room will be ready for carpet after that.

The main room I still have to move a few things out of and finish touching up the woodwork.

If time permits I plan to scrub the floors with water and then use the shop vac to get all the moisture up. If I do not get that completed no big deal.

Posted in Basement.


One Response

Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.

Continuing the Discussion

  1. Newy’s Blog » Blog Archives » Projector Screen Update linked to this post on September 25, 2007

    […] here are the pictures of the projector screen I made that I previously mentioned here, here, here and here. I believe the screen turned out better than I expected. Archived in Basement | […]

You must be logged in to post a comment.