Now that the roof hopefully is fixed. I need to get moving on my new computer rack. I have it all together. Need to move it into place. I just won a used APC Smart UPS 700 rack mount model on ebay. Hopefully I will get that next week. Will need to make room for that 2 U case in the rack and then I will move the router and cable modem down into the basement. Can get most of it ready before I get the ups. After that I hope to be close to having the new server built up. I can move that downstairs also then. I might actually start an automated backup process at that point also. My external scsi box is a bit loud to have on all the time in the office. I won’t have a problem leaving it on in the utility room though. Will be nice to have that all tucked away down there.
Recent Posts
Recent Comments
- dbennett_bensoft on Finally, I got very lucky on an APC AP9211
- Newy's Blog on A few new pc items
- bryan on Flooring has been installed
- bryan on Slow season for tv shows
- bryan on Thinking about getting an eye-fi card
0 Responses
Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.
You must be logged in to post a comment.