Took a few pictures of the basement last night. Not to much has changed but I thought I should update. I have the window in the office all finished. The doorway to the utility room is finished. I have to paint the other side of the door and then I can put the door backup. Here is a link to all of the pictures. I hope to work on the last two doors tonight and also start in on the baseboard trim and get some of the wood for around the small windows in the main room ready and primed. A few hours a night and this thing might be finished soon. Here is a sample of the carpet we are going to go with. We plan to replace the carpet on the stairs and put carpet in the hallway at the bottom of the stairs, the main room and the office. I will put tile in the bathroom at a later time.
Recent Posts
Recent Comments
- dbennett_bensoft on Finally, I got very lucky on an APC AP9211
- Newy's Blog on A few new pc items
- bryan on Flooring has been installed
- bryan on Slow season for tv shows
- bryan on Thinking about getting an eye-fi card
0 Responses
Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.
You must be logged in to post a comment.