I have sprayed the floor 3 times with water. The grout lines are looking pretty good. I plan to spray water on it a few more times today and again in the morning tomorrow. Hopefully that will be enough. I will wait another day or so before I seal the grout. I would think by wednesday evening I should be able to put the shoe molding down. I still have to figure out how I am going to center the light above the sink in the bathroom but that is about it in the bathroom.
A few small items in the bathroom and it will be done. A few small things to touch up in the main room and office. Move a few items out of the main room. That should do it. We will be ready for carpet on the 13th no problem.