Everything is on order

Last week I ordered a new patio door. Looks like that will be in sometime around 6/16/09. Just have to schedule the installer to come out and replace the existing door after it comes in.

We went ahead and booked the flooring installer for the week of July 6th. He will drop off the trim work the week before so I can get a coat of paint on the quarter round and stain the shoe molding for the kitchen.

Saturday I ordered all of the flooring and drop in flush mount registers and trim for the top of the stairs. Now we play the waiting game. Hopefully everything falls into place.

I want to have the door in before the floors. The flooring was a very good price due to over stock. We got very lucky. We wanted either 4 or 5 inch natural red oak. They had 4 inch red oak from a place in Michigan that we really liked. Now to see what it looks like once it comes in and gets installed. I think we are going to be very happy.

Just picked up some Bona floor cleaner in preparation of the new floors. Got a few packs of felt pads so we are ready to put all of the furniture back on the floors after it is installed. Don’t want to mark up any of the floors with furniture.