Skip to content


On track for this week

Last night I want down stairs about 6:30 and started to get things all setup to spray the ceiling. I finished spraying around 8 or 8:30 and started cleaning up. Man am I tired. I have a bit of sanding to do to clean up the walls from over spray but the ceiling is ready for paint. I will proabably go down tonight and start sanding the walls and begin touching up any areas I feel need to be touched up. Hopefully tomorrow night the ceiling will be totally dry and I can start painting the ceiling. If all goes as planned I will have the ceiling finished tommorrow evening. I will be able to put the lights back in and take all the plastic down on thursday evening.

I am very sore and tired today. Talk about a sholder workout. The sprayer is not heavy at all but when you load it with thinned mud, wow it gets heavy very quickly. When you are spraying a large area you can pretty much load it all the way full and you will empty it in less than 5 minutes. When I looked at the ceiling this morning it was looking really good. Not quite dry but it should be mostly dry by this evening.

Posted in Basement.


0 Responses

Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.

You must be logged in to post a comment.