Well I have put all the 5/8th inch drywall up now. It is nice to see the stacks of drywall at the end of the basement getting smaller and now there is only one stack. I estimated pretty good I feel. I need 2 or 3 more sheets of drywall and I will have the ceiling finished. Better to have not enough than have to many I guess. Will start on the walls now. I have one whole wall ready to drywall and the other one has some drywall stacked up against it. The third wall I can drywall part of it but will have to wait to finish it because I need to get the shower in and that requires taking the door apart so I can fit it in. Still plenty of work to do but I like that the ceiling is almost complete. Hopefully tonight or tomorrow I can finish up the drywall on the ibeam and support pole in the center of the basement. That will make things look much better also I think.
Recent Posts
Recent Comments
- dbennett_bensoft on Finally, I got very lucky on an APC AP9211
- Newy's Blog on A few new pc items
- bryan on Flooring has been installed
- bryan on Slow season for tv shows
- bryan on Thinking about getting an eye-fi card
0 Responses
Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.
You must be logged in to post a comment.