Over this past weekend I finished up all the walls I can finish at this time. I put up a few pieces of drywall in the bathroom. I need to have someone over for a few hours to help me finish up the ceiling in the bathroom. I have to wait to put up the drywall on the last wall in the big room until I get the shower and the cabinets for the bathroom. I hope to go get the shower and maybe even cabinets, sink and toilet this week. I may even start putting tile down if I can get all the parts and pieces I need. If all goes smooth and I can get everything finished this weekend, I may be tiling the bathroom next week. Probably not but I can try. Once I get the shower and other stuff in the bathroom I can finish the last wall in the main room and put the door on the bathroom and the french door on the main room. I really need to get the gas stove on order and find the mudding guy so I can get those in the works.
Recent Posts
Recent Comments
- dbennett_bensoft on Finally, I got very lucky on an APC AP9211
- Newy's Blog on A few new pc items
- bryan on Flooring has been installed
- bryan on Slow season for tv shows
- bryan on Thinking about getting an eye-fi card
0 Responses
Stay in touch with the conversation, subscribe to the RSS feed for comments on this post.
You must be logged in to post a comment.